Home/Products/RS 1 (Primer)

RS 1 (Primer)

RS-1 bitumen emulsion primer manufacturers — rapid setting cationic emulsion for tack coat, prime coat, and pothole repair priming on bituminous and granular surfaces.

Product Performance Metrics

Real-time statistics showcasing our product excellence

10,000 MT
Annual Production Capacity
20+
Export Countries
IS 8887, MoRTH 503
Quality Certification
800 MT
Monthly Production Capacity
ParameterSpecification
Product TypeCationic Bitumen Emulsion Primer
GradeRS-1 (Rapid Setting)
Residue on Sieve≤ 0.05%
Viscosity (Saybolt Furol @ 25°C)20–100 s
Residue by Evaporation≥ 57%
Storage Stability (24h)≤ 1%
Particle ChargePositive (Cationic)
ComplianceIS 8887, MoRTH 503, IRC SP-100

Product Overview

YNM Safety is a trusted RS 1 (Primer) manufacturer and supplier, delivering high-quality Rapid Setting cationic bitumen emulsion engineered for pothole repair, tack coat application, and prime coat surface treatment on highways, urban roads, and industrial pavements.

Our RS-1 bitumen emulsion primer is formulated to break and set rapidly on contact with mineral aggregates, providing excellent bonding strength between the existing pavement and new bituminous overlays. It is widely used as the primer layer beneath cold mix asphalt for fast, all-weather pothole patching.

As experienced bitumen emulsion manufacturers, YNM Safety ensures every batch of RS 1 primer complies with IS 8887, MoRTH 503, and IRC SP-100 specifications. The emulsion is supplied in 200 kg steel drums and bulk tankers for both domestic infrastructure projects and international export.

Detailed Specifications

Complete product information including dimensions, origin, and manufacturing details

Country of Origin
India
Manufacturing Location
Hyderabad
Quality Standards
1. IS 8887 2. MoRTH 503 3. IRC SP-100
Packing Options
200 Kg Steel Drums, Bulk Tankers
Minimum Order Quantity (MOQ)
200 Kg
HSN Code
27150090
Shelf Life
6 Months (Sealed)

Export Availability

Our RS 1 (Primer) is available and exported to 20+ worldwide

🌐

Asia

in flagIndialk flagSri Lankanp flagNepalbd flagBangladeshbt flagBhutanmv flagMaldivesae flagUnited Arab Emiratesom flagOmanbh flagBahrain
🌐

Africa

ke flagKenyang flagNigeriaza flagSouth Africaeg flagEgypttz flagTanzania
🌐

Middle East

sa flagSaudi Arabiaqa flagQatarkw flagKuwait
🌐

Others

Project-based export on request
20+
Countries
500+
Active Clients
99.2%
On-Time Delivery

Product Specification

Key features and product advantages of our RS 1 (Primer)

RS 1 (Primer) technical specifications and coating system — YNM Safety
Features

Key Features & Benefits

Rapid setting on contact with aggregate
Excellent adhesion to old and new bituminous surfaces
Cold applied — no heating required
Penetrates granular base layers effectively
All-weather application capability
Low VOC, environmentally safer than cutbacks

Application Areas

Where our RS 1 (Primer) provides maximum road safety and protection

RS 1 (Primer) application example 1 — YNM Safety road infrastructure projects India

Pothole Repair Priming

RS-1 primer is the recommended bond coat for pothole patches before applying cold mix asphalt.

RS 1 (Primer) application example 2 — YNM Safety road infrastructure projects India

Tack Coat for Highway Overlays

RS-1 is used as a tack coat between existing bituminous layers and new asphalt overlays.

RS 1 (Primer) application example 3 — YNM Safety road infrastructure projects India

Prime Coat on Granular Bases

RS-1 primer seals granular sub-bases prior to bituminous surfacing on new road construction.

RS 1 (Primer) application example 4 — YNM Safety road infrastructure projects India

Urban Roads & Municipal Maintenance

Used by municipal corporations for routine pothole and crack maintenance on city streets.

RS 1 (Primer) application example 5 — YNM Safety road infrastructure projects India

Toll Plazas & High-Stress Junctions

RS-1 ensures durable patch repairs at toll plazas and intersections subject to braking stress.

RS 1 (Primer) application example 6 — YNM Safety road infrastructure projects India

Industrial Roads & Container Yards

Suitable for heavy-duty pavement maintenance in industrial estates, ports, and container yards.

Market Growth

RS-1 Primer & Pothole Repair Market Growth | YNM Safety

💰
$1.4B
Current Market Size (2024)
🚀
$2.1B
Projected by 2030
📈
5-7%
CAGR Growth Rate
🌍
20+
Export Countries

The Indian bitumen emulsion market is projected to grow at a 5–7% CAGR through 2030, driven by accelerated highway maintenance programs under NHAI, PMGSY rural connectivity expansion, and municipal pothole repair initiatives across smart cities.

Regional Market Share

MarketShare
Asia Pacific44%
North America18%
Europe16%
Middle East & Africa14%
Latin America8%

Market Size Growth (in Billion USD)

$1.4B
2024
$1.5B
2025
$1.6B
2026
$1.8B
2028
$2.1B
2030

Key Growth Factors of RS 1 (Primer)

01
Increased budget allocation for road maintenance under NHAI and state PWDs
02
Shift from cutback bitumen to environmentally safer emulsions
03
Rapid urbanization driving municipal pothole repair demand
04
PMGSY rural road network expansion
05
Growth in cold-mix patching for monsoon-season repairs
06
Push for low-VOC and worker-safer pavement materials

Manufacturing Process of RS 1 (Primer)

As trusted RS-1 primer manufacturers, YNM Safety produces cationic bitumen emulsion through a controlled colloid mill process to deliver consistent particle size, stable storage performance, and rapid setting characteristics for pothole repair and pavement priming.

01

Base Bitumen Selection

VG-10 or VG-30 paving grade bitumen is selected as the base feedstock based on the required emulsion residue and end-use specification. Each batch is tested for penetration, softening point, and ductility before entering the emulsification process.

02

Aqueous Phase Preparation

Demineralised water is blended with cationic emulsifying agents and a controlled dose of hydrochloric acid to achieve the optimal pH window. This aqueous phase carries the positive charge that defines RS-1 emulsion behaviour.

03

Bitumen Heating

The selected bitumen is heated to 130–150°C in jacketed storage tanks under continuous agitation. Temperature is closely monitored to ensure proper viscosity for colloid mill processing without thermal degradation.

04

Colloid Mill Emulsification

Heated bitumen and aqueous phase are simultaneously fed into a high-shear colloid mill operating at 3,000–6,000 rpm. The mill disperses bitumen into micron-sized droplets coated with emulsifier, producing a stable cationic emulsion.

05

Cooling & Stabilisation

The freshly produced emulsion is cooled through heat exchangers and transferred to stabilisation tanks. A controlled rest period ensures complete emulsifier adsorption and uniform particle size distribution.

06

Quality Testing

Each batch is tested for residue on sieve, Saybolt Furol viscosity, particle charge, storage stability, residue by evaporation, and water content per IS 8887. Only batches meeting all parameters are released.

07

Drum Filling & Bulk Loading

Approved RS-1 emulsion is filled into 200 kg steel drums via automated filling lines, with each drum batch-labelled and sealed. Bulk tanker loading is available for project-based supply.

08

Dispatch & Project Supply

Batches are dispatched with test certificates, MSDS, and batch traceability documents. YNM Safety supports pan-India delivery and export shipments with technical assistance for application crews.

Factory & Quality Proof

See our manufacturing facility and quality certifications that ensure premium product quality

Quality Standards

Compliance with national and international road safety standards

IS 8887

Indian Standard for Bitumen Emulsion (Cationic)

MoRTH 503

Ministry of Road Transport & Highways Specification for Prime & Tack Coat

Customer Success Stories

Real results from satisfied customers who chose RS 1 (Primer)

30 MT
Quantity Supplied
2024
Project Year
100%
Specification Compliance

"Supplied RS-1 bitumen emulsion primer for a monsoon-season pothole repair drive across arterial roads. The rapid-setting emulsion enabled lane reopening within 30 minutes of patching."

Frequently Asked Questions

Answers about this product from YNM Safety—manufacturing, standards, supply, and support.

YNM Safety · RS 1 (Primer)